Public Hearing Notices

  • Date of Public Hearing
Project
Public Notice/ Salient Features
Also See: EIA & EMP
22-07-2011 Teesta Stage IV - 520 MW NHPC Ltd. proposes to construct a 520 MW Teesta Stage IV HEP by harnessing the water of Teesta River in the North District of Sikkim.
»  Salient Features
EIA and EMP Executive Summary of Teesta Stage IV HEP » English ¦ Nepali ¦ Bhutia ¦ Lepcha
18-06-2009 Tashiding HEP - 97 MW (2 x 48.5 MW) M/s Shiga Energy Pvt. Ltd., proposes to construct a 97 MW hydro-electric project by utilizing the water of Rathong Chhu a tributary of Rangit river in the West District of Sikkim.
» Salient Features
17-06-2009 Ting Ting HEP - 99 MW (2 x49.5 MW) M/s TT Energy Pvt. Ltd., proposes to construct a 99 MW hydro-electric project by utilizing the water of Rathong Chhu a tributary of Rangit river in the West District of Sikkim.
» Salient Features
06-08-2008 Rangit II HEP - 66 MW (2 x 33 MW) M/s Sikkim Hydro Power Ventures Ltd. (a subsidiary of Gammon India Ltd.) proposes to construct a 66 MW hydro-electric project by utilizing water of Rimbi Khola, a tributary of Rathangchu in the West District of Sikkim.
»  Salient Features
16-11-2007 Dikchu HEP - 96 MW (3 x 32 MW) M/s Sneha Kinetic Power Project Limited proposes to construct a 96 MW hydro-electric project by utilizing the water of River Dikchu, a tributary of Teesta River in the State of Sikkim.
»  Salient Features