| 22-07-2011 | Teesta Stage IV - 520 MW |
NHPC Ltd. proposes to construct a 520 MW Teesta Stage IV HEP by
harnessing the water of Teesta River in the North District of Sikkim.
» Salient Features EIA and EMP Executive Summary of Teesta Stage IV HEP » English ¦ Nepali ¦ Bhutia ¦ Lepcha |
|
| 18-06-2009 | Tashiding HEP - 97 MW (2 x 48.5 MW) |
M/s Shiga Energy Pvt.
Ltd., proposes to construct a 97 MW hydro-electric project by utilizing the
water of Rathong Chhu a tributary of Rangit river in the West District of
Sikkim.
» Salient Features |
|
| 17-06-2009 | Ting Ting HEP - 99 MW (2 x49.5 MW) |
M/s TT Energy Pvt.
Ltd., proposes to construct a 99 MW hydro-electric project by utilizing the
water of Rathong Chhu a tributary of Rangit river in the West District of
Sikkim.
» Salient Features |
|
| 06-08-2008 | Rangit II HEP - 66 MW (2 x 33 MW) | M/s Sikkim Hydro Power Ventures Ltd. (a
subsidiary of Gammon India Ltd.) proposes to construct a
66 MW
hydro-electric project by utilizing water of Rimbi
Khola, a tributary of Rathangchu in the West
District of Sikkim.
» Salient Features |
|
| 16-11-2007 | Dikchu HEP - 96 MW (3 x 32 MW) | M/s Sneha Kinetic Power Project
Limited proposes to construct a 96 MW
hydro-electric project by utilizing the water of
River Dikchu, a tributary of Teesta River in the State of Sikkim.
» Salient Features |
|